Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Mar 22, 2022     Top cowl sanding and ElectroAir coil pack - (3 hours)       Category: Engine
Secured 4th corner of ElectroAir coil pack to engine mount. Ended up using an AN3 bolt to make things fit and special tool from HFS Mfg to secure the last corner of the coil pack . Adel clamp tool works great in tight places. Sanded the top cowl some more and found some places I need to fill. Looked into finishing up the parking brake valve install. Should have riveted it in place before mounting the oil cooler to the firewall. No access without removing a LOT of stuff. Gonna have to think on this.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.